Monday, April 07, 2008

Backlog Management


Backlog management is one of the keys to a good equipment maintenance system. If the effort that goes into condition monitoring does not result in a high percentage of planned and scheduled repairs, the corresponding results of reliability, costs and availability will be adversely effected. The planning and scheduling routines will also be disrupted.

Backlog is generally understood to be the work that has not been completed by the nominated “required-by-date”. Backlogs are also managed as pending workload for the repair centers. Our approach to Backlog Management is to view it as a powerful tool to proactively prevent failures.
It is commonly understood that there are certain types of failures that will occur, with no signs or measurable warning. Examples are those related to the electronic or electrical control systems. Fortunately our experience shows that most of the failures that mobile equipment experience that cause significant downtime are detectable well in advance of failure, allowing the organization to plan the appropriate corrective actions.

There are two areas that we would like to stress: the early detection of possible failures and their appropriate corrective planning actions. Early detection of potential problems increases the time window to plan the necessary repairs.

We would like to use this diagram above to illustrate our approach to Backlog Management. Backlog Management is the process occurring between the detection of a symptom of a potential or hidden failure and the occurrence of the actual failure itself.

Condition Monitoring and Backlog Management are so critical to achieving the goal of reliability, that any maintenance organization must be able to assess and improve the process. Establishing a logical approach for this planning stage is probably the first step.

We would like to contribute to this effort by presenting a process that was developed in conjunction with our mining dealers.

Central Limit Theorem

A very important and useful concept in statistics is the Central Limit Theorem. There are essentially three things we want to learn about any distribution: 1) The location of its center; 2) its width, 3) and how it is distributed. The central limit theorem helps us approximate all three.

Central Limit Theorem: As sample size increases, the sampling distribution of sample means approaches that of a normal distribution with a mean the same as the population and a standard deviation equal to the standard deviation of the population divided by the square root of n (the sample size).

Stated another way, if you draw simple random samples (SRS) of size n from any population whatsoever with mean [mu] and finite standard deviation [sigma], when n is large, the sampling distribution of the sample means [x bar] is close to a normal distribution with mean [mu] and standard deviation [sigma]/ [square root] (n). This normal distribution is often denoted by: N([mu], [sigma]/ [square root] (n)).

Confidence Intervals/Margin of Error

The value [sigma] [x bar] = [sigma]/ [square root] n is often termed the standard error of the mean. It is used extensively to calculate the margin of error which in turn is used to calculate confidence intervals.

Remember, if we sample enough times, we will obtain a very reasonable estimate of both the population mean and population standard deviation. This is true whether or not the population is normally distributed. However, normally distributed populations are very common. Populations which are not normal are often "heap-shaped" or "mound-shaped". Some skewness might be involved (mean left or right of median due to a "tail") or those dreaded outliers may be present. It is good practice to check these concerns before trying to infer anything about your population from your sample.

Since 95.0% of a normally distributed population is within 1.96 (95% is within about 2) standard deviations of the mean, we can often calculate an interval around the statistic of interest which 95% of the time would contain the population parameter of interest. We will assume for sake of discussion that this parameter is the mean.

The margin of error is the standard error of the mean:
[sigma]/ [square root] n multiplied by the appropriate z-score (1.96 for 95%).

A 95% confidence interval is formed as: estimate +/- margin of error.

We can say we are 95% confident that the unknown population parameter lies within our given range. This is to say, the method we use will generate an interval containing the parameter of interest 95% of the time. For life-and-death situations, 99% or higher confidence intervals may quite appropriately be chosen.

Example: Assume the population is the U.S. population with a mean IQ of 100 and standard deviation of 15. Assume further that we draw a sample of n=5 with the following values: 100, 100, 100, 100, 150. The sample mean is then 110 and the sample standard deviation is easily calculated as sqrt((102+102+102+102+402)/(5-1)) =sqrt(500) or approximately 22.4. The standard error of the mean is sqrt(500)/sqrt(5)=sqrt(100)=10. Our 95% confidence intervals are then formed with z=+/-1.96. Thus based on this sample we can be 95% confident that the population mean lies betwen 110-19.6 and 110+19.6 or in (90.4,129.6). Suppose, however, that you did not know the population standard deviation. Then since this is also a small sample you would use the t-statistics. The t-value of 2.776 would give you a margin of error of 27.8 and a corresponding confidence interval of (82.2, 137.8).

Finite Population Correction Factor

The finite population correction factor is: [square root]((N-n)/(N-1)).

If you are sampling without replacement and your sample size is more than, say, 5% of the finite population (N), you need to adjust (reduce) the standard error by multiplying it by the finite population correction factor as specified above. If we can assume that the population is infinite or that our sample size does not exceed 5% of the population size (or we are sampling with replacement), then there is no need to apply this correction factor.

Friday, March 28, 2008

7 Principles of Toyota Production System

1. Reduced Setup Times:
All setup practices are wasteful because they add no value and they tie up labor and equipment. By organizing procedures, using carts, and training workers to do their own setups, Toyota managed to slash setup times from months to hours and sometimes even minutes.

2. Small-Lot Production:
Producing things in large batches results in huge setup costs, high capital cost of high-speed dedicated machinery, larger inventories, extended lead times, and larger defect costs. Because Toyota has found the way to make setups short and inexpensive, it became possible for them to economically produce a variety of things in small quantities.

2. Employee Involvement and Empowerment:
Toyota organized their workers by forming teams and gave them the responsibility and training to do many specialized tasks. Teams are also given responsibility for housekeeping and minor equipment repair. Each team has a leader who also works as one of them on the line.

4. Quality at the Source:
To eliminate product defects, they must be discovered and corrected as soon as possible. Since workers are at the best position to discover a defect and to immediately fix it, they are assigned this responsibility. If a defect cannot be readily fixed, any worker can halt the entire line by pulling a cord (called Jidoka).

5. Equipment Maintenance:
Toyota operators are assigned primary responsibility for basic maintenance since they are in the best position to defect signs of malfunctions. Maintenance specialists diagnose and fix only complex problems, improve the performance of equipment, and train workers in maintenance.

6. Pull Production:

To reduce inventory holding costs and lead times, Toyota developed the pull production method wherein the quantity of work performed at each stage of the process is dictated solely by demand for materials from the immediate next stage. The Kamban scheme coordinates the flow of small containers of materials between stages. This is where the term Just-in-Time (JIT) originated.

7.
Supplier Involvement:
Toyota treats its suppliers as partners, as integral elements of Toyota Production System (TPS). Suppliers are trained in ways to reduce setup times, inventories, defects, machine breakdowns etc., and take responsibility to deliver their best possible parts.